ADU builders

ADU Construction, Type by Type

A second home on your lot can be a new cottage, a converted garage, a basement apartment or a wing of the house. Each one is built differently, and your property decides which are realistic.

What gets built, and what gets reused

The biggest difference between ADU types is how much of the work is new construction and how much reuses the house or garage you already have.

ADU typeWhat is newWhat is reusedWhat usually decides it
DetachedFoundation, structure, roof, all systemsUtility services from the houseLot size, setbacks, utility distance
Backyard placementThe building plus paths, fencing and plantingThe yard's layout and treesAccess, privacy, sewer route
AttachedAn addition with its own entryOne wall of the house, sometimes the roof lineHow your city classifies it
Garage conversionInsulation, windows, plumbing, finishesSlab, walls, roofCondition of the garage, lost parking
Above garageA full second floor and a stairThe garage footprintWhether the structure can carry it
BasementEntrance, egress, kitchen, bathFoundation, structure, most servicesCeiling height, light, egress
InternalSeparation, kitchen, bath, entryAlmost the whole houseFloor plan, state IADU rules

How ADU construction differs by type

An accessory dwelling unit is a complete second home on a single-family lot: its own kitchen, bathroom, sleeping area and entrance. The finished result can look similar across types. The construction path does not.

New structures

A detached ADU is built like a small house: excavation, footings or a slab, framing, roof, exterior, then plumbing, electrical and mechanical systems. Everything is new, so everything is priced. The site sets most of the limits, which is why our detached ADU page leads with lot size and setbacks and our backyard ADU page covers where the building sits in the yard.

Additions

An attached ADU is new construction that joins the house. It needs a foundation and roof of its own, plus careful work where old meets new: the tie-in to the existing roof, flashing at the shared wall, and fire and sound separation between the two homes. An ADU above a garage is also an addition, only vertical, and it depends on whether the garage below can carry a floor of living space.

Conversions

Garage conversions, basement ADUs and other internal ADUs reuse an existing shell. The work is inside it: insulation, new windows or an egress well, a kitchen and bathroom, new circuits, heating and cooling, and a separate entrance. Conversions often cost less than new buildings, but hidden conditions matter more. A cracked slab, a low beam or a sewer line that runs the wrong way can change the scope.

Who each type tends to suit

The goal matters as much as the property. A few patterns come up again and again:

  • Housing a parent: step-free, single-level space close to the family, often a detached cottage, a garage conversion or a ground-floor wing. See in-law ADUs.
  • Two adult households sharing one lot: the most separation you can get, with room to change who lives where later. See multigenerational ADUs.
  • A long-term rental: a private entrance and outdoor space, and sound separation that tenants and owners both appreciate.
  • Flexible or guest space: often a conversion, because it adds the least structure.

Property considerations

Before any type is chosen, the property is checked against the rules and the ground. That means zoning, lot size and width, setbacks, existing coverage, parking, access for equipment, slope, and where the sewer, water, gas and power enter the house. Our ADU feasibility review works through those in order.

Rules differ more between types than most people expect. Utah law makes an internal ADU a permitted use in any area zoned primarily for residential use, and limits what cities can require for one. Detached units are left more to each city, although a new state law, Utah Code 10-21-304, took effect October 1, 2026 and requires qualifying cities to permit detached ADUs on lots of 11,000 square feet or more. The approval route also varies: Salt Lake City lists ADUs as a permitted use, Millcreek treats attached and detached ADUs as permitted uses in its R-1 and A zones, and Cottonwood Heights currently treats a detached ADU as a conditional use decided after a Planning Commission hearing. Most of these cities allow one ADU per lot, while South Salt Lake allows one internal and one external ADU on the same lot.

Design considerations

Small homes have no room for wasted space. Across every type we plan around daylight, storage, a real kitchen and a bathroom sized for daily use, privacy between the two households, and an exterior that belongs with the main house. Several cities write design matching into their codes. Our ADU design page explains the approach, and ADU floor plans shows how layouts change with size.

Construction considerations

Whatever the type, a few things decide how smoothly construction goes:

  • Access: whether an excavator, concrete truck or material delivery can reach the work. See ADU site access.
  • Living through it: conversions and additions happen next to, or under, a household that is still living there.
  • Utilities: tying a second home into the existing sewer, water and electrical service. See ADU utility connections.
  • Inspections: each stage is inspected before it is covered up, so sequencing matters.

What drives the cost

We do not publish price ranges, because the property changes them too much to be useful. The drivers are consistent, though: how much is new construction, the foundation, the length and difficulty of utility runs, access, size, the number of kitchens and bathrooms, finishes, engineering and city and utility fees. The ADU cost guide explains each one, and ADU budget planning covers contingency and soft costs.

How an ADU project runs with us

One sequence, whatever the type: feasibility, site evaluation, design, engineering where it is required, permitting, pre-construction planning, construction, inspections and completion. We coordinate each step and manage the project so you are not the one chasing designers, engineers, utilities and trades. If you want to know how that works as a contract, read ADU design-build. For the city side, see ADU permitting. The full process page explains what you decide at each step.

Questions about ADU construction

Which type of ADU is easiest to build?

Usually the one that reuses the most of what you already have. A basement or other internal ADU inside a sound house avoids a new foundation, roof and long utility runs, so it tends to be the simplest construction job. It is not always the simplest project, though: ceiling height, egress and the separation between units can take real work. The right answer depends on the house you start with.

Can I build more than one ADU on my lot?

In most cities we work in, no. Millcreek, Murray, Sandy and Cottonwood Heights allow one ADU per lot. South Salt Lake is an exception: its code allows one internal and one external ADU on the same lot. Check your own city before planning a second unit.

Is a detached ADU always the best choice for a rental?

Not always. A detached unit gives the most privacy, but it is the most expensive type and the one the lot limits most. An internal or basement unit with its own entrance can work well for a long-term tenant, and state law makes internal ADUs a permitted use in areas zoned primarily for residential use. Compare the types against your lot and budget before deciding.

Do I need a different builder for each type of ADU?

No, but the builder needs to understand each type. A conversion is closer to a careful remodel with new systems, while a detached unit is a small house built from the ground up. We plan and manage all of them, starting with what the property can support.

What should I decide first, the type or the budget?

Start with the property. Once you know which types your lot and house can realistically hold, the budget conversation gets much clearer, because the biggest cost drivers are tied to the type and the site. Our feasibility review is built around that order.