Call (385) 483-0438 ADU specialists · Millcreek & Salt Lake County Feasibility, design, permits and construction
Detached backyard ADU with charcoal board-and-batten siding and a cedar accent wall, a flagstone path leading back to the main house

ADU builders in Millcreek, Utah

Your Property May Have Room for More.

Millcreek ADU Co. is an ADU specialist. We show you what your lot can support and what it will likely cost.

The first question is what your property will allow

Most homeowners who ask about an ADU are not ready to talk about finishes. They want to know whether a second, smaller home is even possible on their lot, and roughly what it would take. That is a fair question, and it deserves a straight answer before anyone draws a floor plan.

An accessory dwelling unit is a complete, self-contained living space on a single-family property: its own entrance, kitchen, bathroom and sleeping area. It can be a detached cottage in the backyard, a converted garage, a unit above a garage, or a basement or wing of the house turned into its own apartment.

Each of those raises different questions about zoning, structure, utilities and cost. We work through them in order, starting with the property, so you can decide with real information instead of guesses.

Why homeowners build ADUs

  • Room for a parent who wants to live close by and keep their own front door
  • A place for grown children saving for a home of their own in an expensive market
  • Long-term rental income from a unit on land you already own
  • Guest space for visiting family that does not take over the main house
  • A future downsize: move into the ADU and let family or a tenant take the main home
  • A separate studio or office that can become a dwelling later if plans change

Rental income and resale value are never guaranteed. Our rental income guide explains the assumptions worth testing first.

Site plan of a residential lot on a clipboard with a tape measure and survey flags marking a possible ADU footprint in a backyard

Property feasibility

Property first. Plans second.

The most expensive way to find out a lot cannot take an ADU is to pay for full plans first. We start with the property: what is already there, what the city allows, and what it would practically take to build. The feasibility report is free.

  • Zoning and rulesWhat your city allows for the ADU type you have in mind, including size, height and occupancy rules.
  • Setbacks and lotDistances to property lines and the house, lot coverage, easements and slope.
  • AccessHow materials, equipment and later the occupant get to the unit.
  • UtilitiesSewer, water, gas and electrical capacity, and how far each has to run.
  • ParkingWhether the city requires an added space and where it could go.
  • Your goalsWho will live there and for how long, which shapes the right type and layout.

How an ADU feasibility review works

Understand the cost before you commit

There is no honest single price for an ADU. Two units the same size can cost very different amounts because one needs a new sewer lateral run the length of the lot and the other can tie in a few feet away. What we can do is show you where the money goes, so the budget conversation happens before you are committed rather than halfway through construction.

What usually moves the number

Property and structure

  • ADU type: conversion of existing space or a new building
  • Size and layout, especially kitchens and bathrooms
  • Foundation and any structural work or engineering
  • Utility runs and whether service needs upgrading
  • Site access, grading and what has to be moved

What you control

Design and scope

  • Finish level for cabinets, flooring, fixtures and exterior
  • Window count and size, and ceiling height
  • How closely the exterior matches the main house
  • Whether the unit is built for rental, family or both
  • Timing, and decisions made before construction starts

What an ADU costs in UtahHow to plan an ADU budget

Compact ADU living area with a galley kitchen in light oak, a small dining table by a tall window and a vaulted ceiling with a wood beam

Small homes need careful design

An ADU has no spare square footage. Every door swing, window and closet has to earn its place, and the unit has to sit well next to the main house without crowding it. Good design is what makes a small unit feel calm instead of cramped, and it is what keeps it from looking like a shed in the backyard.

  • PlacementWhere the unit sits on the lot, and how it relates to the house, the yard and the neighbors.
  • PrivacyEntries, windows and outdoor space arranged so both households have their own.
  • LightWindow placement and ceiling height that make a small plan feel open.
  • FitRooflines, materials and colors that complement the main home.

How we approach ADU design

One guided project

How an ADU project runs

An ADU involves designers, engineers, the city, utility providers and several trades. We organize them into one clear sequence so you are not the one coordinating it all.

  1. Feasibility

    The property, the rules and your goals, checked before plans.

  2. Design

    A layout and exterior that fit the lot, the house and the budget.

  3. Engineering

    Structural and site engineering where the project requires it.

  4. Permitting

    Drawings and applications prepared for your city's review.

  5. Construction

    Utilities, foundation, framing, systems and finishes, in order.

  6. Inspection

    City inspections through final approval to occupy.

See the full ADU process

Established Salt Lake Valley street with mature trees and modest homes, the Wasatch Range behind

Millcreek and Salt Lake County

We work with homeowners in Millcreek and nearby Salt Lake County cities. Each city writes its own ADU rules and runs its own permit process, so what works on a Millcreek lot may not carry over to Sandy or Salt Lake City. Each area page covers what is different.

Common questions about ADUs

Can I build an ADU on my property?

Possibly, and the answer depends on more than lot size. Zoning, setbacks from property lines, how the main house sits on the lot, access for construction and for the future occupant, parking, and where the sewer, water and electrical service can be connected all play a part. The type of ADU matters too: a basement or internal unit can work on a lot that has no room for a detached one. That is why we look at the property first, before anyone pays for full plans.

How much does an ADU cost?

It depends mostly on the type and size of the unit, the foundation, how far utilities have to run, how easy the site is to reach, how much engineering the design needs, city fees and the finishes you choose. A basement conversion and a new detached cottage are very different projects. We would rather walk you through what drives the number on your property than quote a figure that does not fit it. Our Utah ADU cost guide explains each factor.

What is the difference between a detached ADU and an internal ADU?

A detached ADU is a separate small home built in the yard, with its own foundation, roof and utility connections. An internal ADU is created inside the existing house, most often in a basement or one wing, with its own entrance, kitchen and bathroom. Cities often treat the two differently, so the permit path, parking rules and owner-occupancy requirements can change depending on which you choose.

Do I have to live on the property if I build an ADU?

Some cities require the owner to live in either the main home or the ADU, and the rules can differ between internal and detached units. Requirements vary by municipality and they change, so we check your city's current code as part of the feasibility review rather than assuming one answer applies everywhere.

Can I rent my ADU out?

Long-term rental is one of the most common reasons homeowners build an ADU. Short-term rentals are a different matter, and many Utah cities restrict or prohibit them for ADUs. We cannot promise any particular rental income, but we can explain the local rules and the costs and assumptions to think through before you decide.

How long does an ADU project take?

The schedule has several parts: feasibility and design, engineering where needed, city review and permits, then construction and inspections. Permit review times depend on the city and how complete the application is. Construction time depends on the type of unit, a basement conversion is usually quicker than a new detached building, and on weather and utility work. We lay out a realistic sequence for your project before construction starts.

More ADU questions and answers

Start with your property

See what your property can support

You do not need plans, a budget or a firm decision. Tell us where the property is and what you have in mind. We will follow up to talk through what the lot could realistically support and what the next step would be.

  1. We read what you send and follow up with a few questions about the property and your goals.
  2. We look at feasibility: the rules that apply, the lot, the house and the likely cost drivers, and send you a free feasibility report.
  3. You decide what happens next. If an ADU does not make sense on your property, we will say so plainly.

Not ready to talk yet? Start with the questions that decide whether an ADU will work.

Tell us about your property

Name and phone are required. The rest helps us prepare for the conversation.

We use the information you send only to respond to your inquiry about your property. Form submissions are delivered to us by FormSubmit, an email forwarding service. Privacy policy