What an ADU Costs in Utah
There is no honest single price for an ADU. There is a clear set of things that decide it, and most of them can be checked on your property before you commit to anything.
Search for ADU prices and you will find figures that range so widely they are nearly useless. That is not because builders are hiding something. It is because an ADU's cost is decided mostly by the property it sits on and the type of unit, and those vary more than almost anything else in residential construction. This guide explains where the money goes, which fees we could confirm from official sources in Salt Lake County, and what we need to know to estimate your project.
The biggest decision: convert or build new
The type of ADU sets the baseline more than any other factor.
- Internal and basement ADUs use a structure, roof and foundation that already exist. The costs go into making the space a separate, code-compliant dwelling: egress, fire separation, a kitchen and bathroom, ventilation and often a separate entrance. See basement ADU cost.
- Garage conversions also reuse a structure, but a garage was never built to be lived in. The slab, walls, insulation, windows and utilities usually all need work, and lost parking may have to be replaced. See garage conversion cost.
- Detached and attached new builds involve everything: foundation, framing, roof, exterior, systems and finishes, plus the site work and utility connections to reach them. See detached ADU cost.
Site and utility costs
These are the costs homeowners most often underestimate, and they have nothing to do with how nice the unit is.
- Sewer: a detached ADU needs a sewer connection, usually tied into the existing lateral. The distance, depth and slope of that run, and whether it has to cross a driveway or large trees, can move the budget significantly. Some lots need a pump.
- Water: a new line from the main house or the meter, sized for a second dwelling.
- Electrical: many existing panels do not have capacity for a second dwelling with its own kitchen and heating. A service upgrade involves the utility as well as the electrician.
- Gas: if used, another line and possibly a larger meter.
- Access and grading: a backyard that equipment cannot reach means more hand work. Slopes add retaining, drainage and engineering.
Several Salt Lake County cities, including Millcreek, Murray and South Salt Lake, prohibit separate utility meters for an ADU, so service is shared with the main house. That affects how systems are sized. Our guide to ADU utility connections goes into each one.
Structure and foundation
New detached units need a foundation designed for the soil, frost depth and seismic requirements that apply along the Wasatch Front. Units above a garage need the existing structure evaluated and often reinforced. Basement conversions may need a new egress opening cut through a foundation wall, with a window well. Each of these can require an engineer and adds to the permit drawings.
Size, layout and finishes
Size matters, but less directly than people expect. Kitchens and bathrooms are the most expensive rooms in any home, and every ADU has at least one of each, so a smaller ADU costs more per square foot than a larger one. That is why cost per square foot is a misleading way to compare ADU bids. Beyond that, the choices you control are real: cabinet and fixture level, flooring, window count and size, ceiling height and exterior materials. Some cities, Millcreek among them, require exterior materials and colors that relate to the main house, which should be part of the budget from the start.
Soft costs
These are the costs of getting to construction: design, engineering, surveys where needed, city application and review fees, building permit fees and utility district charges. They are a smaller share than construction, but they come first, which is why a feasibility review before full design is worth doing.
Official fees we could confirm
Fees change and depend on the project, so treat these as examples from official schedules, checked on the date shown in the sources below, not as a complete list:
| Fee | Amount | Source |
|---|---|---|
| Millcreek ADU compliance determination (internal or attached) | $250 | Millcreek fee schedule |
| Millcreek ADU compliance determination (detached) | $250 plus site plan approval fee | Millcreek fee schedule |
| Murray ADU permit (Planning) | $125 | Murray ADU application |
| South Salt Lake ADU predevelopment review | $50 | South Salt Lake ADU page |
| Mt. Olympus Improvement District sewer, property with an ADU | One additional residential equivalent ($30 per month in 2026) plus one capacity fee ($758 in 2026) | MOID 2026 schedule |
Building permit fees are usually calculated from the project's valuation and are separate from these. Renting the ADU typically requires a city business license, which carries its own fee. State law bars impact fees on an internal ADU within an existing home (Utah Code 11-36a-202), but that exemption does not extend to detached ADUs.
What we need to estimate your ADU
A useful estimate starts with the property, not a price list. We look at:
- The address and zone, so the right city's rules and fees apply.
- The ADU type and rough size you have in mind, and who it is for.
- The lot: where the unit could go, access, slope and trees.
- Where the sewer lateral, water line and electrical service are, and the capacity of the panel.
- For conversions, the condition of the existing space.
- Your finish expectations and a budget range, even a rough one.
From that, the budget can be built in the right order: fixed site and utility costs first, then the unit, then the choices you control. Our ADU budget planning guide explains how to set a contingency and plan allowances.
Paying for it
Most homeowners use some combination of savings, a home equity loan or line of credit, or a cash-out refinance. Salt Lake City's Redevelopment Agency offers the Backyard Keys ADU Loan Program to eligible owner-occupants west of I-15. See how to finance an ADU. If rental income is part of the plan, read ADU rental income for the assumptions worth testing; we do not promise any rental return.
Questions about ADU costs
Why won't you give a single price for an ADU?
Because a single number would be wrong for most properties. Two ADUs of the same size can differ enormously in cost depending on whether they are new buildings or conversions, how far the sewer and electrical service have to run, what the soil and slope require, how equipment reaches the site and which finishes are chosen. We would rather work out the drivers on your property and give you a range that actually applies to it.
Is a basement or garage conversion cheaper than a detached ADU?
Usually, because the structure, roof and much of the foundation already exist. But conversions have their own costs: egress windows cut into foundation walls, fire separation, raising or insulating floors, new plumbing runs to a slab, and upgrading an electrical panel. A conversion with a difficult drain line can cost more than expected, so the comparison has to be made on the actual house.
Do impact fees apply to ADUs in Utah?
State law bars impact fees on an internal ADU built within an existing primary dwelling. There is no equivalent state exemption for detached ADUs, and whether a particular city or utility district charges impact or connection fees on a detached unit depends on its own ordinances and fee schedules. Utility district charges can also apply: for example, Mt. Olympus Improvement District's 2026 schedule treats a property with an ADU as one additional residential equivalent plus one capacity fee.
Are there any programs that help pay for an ADU?
Some. Salt Lake City's Redevelopment Agency runs the Backyard Keys ADU Loan Program for eligible owner-occupants west of I-15, and conventional options such as home equity loans and cash-out refinancing are common. Our ADU financing guide covers the general options. We do not arrange financing ourselves.